Print
Diaphragm single stage manual switchover board – CC283/CC383
Equipment for gas systems > Speciality gas equipment > Supply & switchover boards
Key advantages
  • Ultra compact switchover board
  • Ready-to-install system with all components pre-mounted on a panel
  • Can be equipped with a collection tube on the relief valve and purge outlet
  • Easy-fix system: Can be delivered on a fixation rail for easier and quicker installation
  • Easy handling thanks to visible technical drawings with key functionalities marked on the back plate
  • Can be equipped with or without outlet shut-off valve or purging valve
  • Using contact gauges or pressure sensor, the switchover board can also be connected to an alarm box to indicate the source status
  • To connect up to 6 cylinders on each side you can use Rotarex extensions

Specifications
Inlet / outlet ports1/4 NPT Other connections available on request
O-ringEPDM - standard FPM
DiaphragmHastelloy®
Leak rate10-8 mbar ℓ/s He
Temperature range-20 to +60 °c
Nominal flowUp to 25 Nm3/h (N₂) depending on outlet pressure
Gauges1/4 NPT
Inlet pressure230/300 bar
Outlet pressure10/16/35/50 bar
Oxygen useOnly with brass and inlet pressure 230 bar
Dimensional drawings
Product Configurator
 
Body material
Inlet pressure
Outlet pressure
Outlet valve
Purge
Measurement
Sensors
Configurations
Gas*
CC
CB
283
10
V
P
M63
HP
S
N2
 
Downloadable catalogs, brochures
  • Supply and Switchover Boards
    Last update: Mar 17, 2021
    Available in: en/cn/de/fr
Connect with an Expert
×

This site uses cookies.

Rotarex uses cookies to ensure a better and easier online experience. Please click here to accept the continued use of these cookies after reading our revised COOKIES POLICY.

Please note, you may continue to use the website even if you do not accept the use of cookies. However, the visitor experience on subsequent visits will be diminished.

Read the full COOKIES POLICY.